Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. The following points have to be considered while analyzing the rate. Cement Estimation Plastering Rate Analysis. Formulae are hidden inside CELLS and are not visible. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. The plaster contains a mixture of sand and cement only. work and Stone work: (other than Dam) 11-22 11.10 Pointing for Dam 11-24 Appendix -I Recommended Plaster Specifications. Copyright © 2016. quantity-takeoff.com, all rights reserved, Estimating and costing of civil engineering projects, Usefulness of construction formulas and equations for building projects, Excel Spreadsheet Design for Engineering Calculations, Calculate Quantities of Materials for Concrete, Construction Cost to complete using Excel, Some important tips for Civil Site Engineering, Excel based bar bending schedule program for Reinforcement Steel, Brief overview of Bill Of Quantities or BOQ, Classic Job Estimate Sheet for Contractors, Quiz On Reinforced Concrete Beam Concepts Interview Questions, Different types of Roof Trusses for diverse lengths, Method of concrete mix design and illustration, Civil Engineering Retaining Wall Design Spreadsheet, Download Civil Engineering Building Codes, Definition & Characterize of Composite Beams and Columns, How to get the load distance of a crane over a building, Download Construction Cost Estimating Spreadsheet, Quantity Take-Off software for extracting material quantities, The duties and responsibilities of a construction site engineer, How to details Isolated Footing for Reinforcement, Usefulness of bar bending schedule for concrete construction, Types of pile foundations and their usages. workability. These information are collected from a standard DSR book. Generally taken 10 mm. Here, a table is created in excel that contains the quantity of labor per 100 square meter of work as well as rate of labor each day for 8 hours. Excel for Quantity survey and Rate analysis. The rate analysis of mortar need to be done for the calculated quantity required. RATE ANALYSIS OF REINFORCED CONCRETE WORKS - EXCEL CALCULATOR Rate Analysis of Plaster. By .Ali Hyder Gadhi 2. Labour Estimation 3. So we need Cement – 1.67 Bags  and Sand – 0.174 Cum. 7 it suya 10 KG alçı. Initially, Unit Area is thoroughly analyzed for determining the quantity of material that will be plaster in wet form. 11-26 Appendix-II Recommended Mix Proportions. Read here the rate analysis of cement mortar to know how to calculate quantity of cement and sand in mortar. So, to calculate the rate analysis of plaster we have to know the the quantity and rate of each materials. sqm 105.00 1119 Labour only for item 1117 & 1118 sqm 35.00 1120 Pebble dash plaster on walls with a mixture of washed pebbles or Excel sheet for paint. Rate+Analysis+Format.xls Rate Analysis of Plaster. Doing rate analysis for every material used at construction project is prime activity. 120 – 160 min. lock. They are in Microsoft Excel format which most are familiar with. Analysis & Rates. Read here the rate analysis of cement mortar to know how to calculate quantity of cement and sand in mortar. Calculation of materials: Material should be calculated for sand, cement, coarse aggregate and steel for a specific mix design. Read PDF Civil Rate Analysis Excelregarded as Unit Area. ... (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. Bala is a Planning & QS Engineer working at Megha Engineering & Infrastructure Limited who has more than 9+ Years of experience in Building & Infrastructure. 300 – 350 dakia. Then cost of plaster is fixed for thickness of plaster is different of 12 mm and 10 mm. Get the Excel Sheet – Rate Analysis of Plastering. Bala is a Planning & QS Engineer working at Megha Engineering & Infrastructure Limited who has more than 9+ Years of experience in Building & Infrastructure. Tools and equipment 6. First we need to calculate area of plaster by length and width. Excavation in rock (For viewing only) ... c. Plaster & Paint. Consumption. Necessary data for RCC Rate Analysis: 1. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during Page 3/6 Kullanim suresi. The plaster contains a mixture of sand and cement only. ... sanctions, labor and material etc. Now, we are going to see the rate analysis for plastering. Plastering work involves proportion of mortar, area of plastering, thickness of plastering, volume of plaster, 50% for voids, 10% of unevenness, cement and cement bags required for dry mortar, cost of material for cement and sand. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. In this article there is comparison between through rate contact and labor contract. The use of MS-Excel like Spreadsheets is a widely accepted practice for doing the rate analysis. All calculations of Plaster for rate analysis. involved in project, using the same rate analysis constants. He is the author, editor of Civil Planets. As per below rate analysis of plaster; Providing and laying in 12 mm thick plasterwork 1: 4 (1 cement: 4 coarse sand: 1) excluding the … Cost of 1 ft2 is approx 15 rupees. The rate of … Save my name, email, and website in this browser for the next time I comment. lock. This calculation calculates of cement, sand (Plaster = […] Get the Excel Sheet – Rate Analysis of Plastering. So, Let us take an example. Initially, Unit Area is thoroughly analyzed for determining the quantity of material that will be plaster in wet form. To get almost nearby accurate rate analysis, you have to consider the following things, 1. (adsbygoogle = window.adsbygoogle || []).push({}); Here, a table is created in excel that contains the quantity of labor per 100 square meter of work as well as rate of labor each day for 8 hours. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Overhead & Profit 300 – 350 min. What is the full form of 1BHK, 2BHK, 2.5BHK? Rate for Plaster ,Tiles and Paint. Rates Analysis For Calculating Material and Labour for building works 1. seven litr water in ten Kg saten gypsum plaster Water / plaster ratio. (1) Excavation. They are designed to make built-up rate an easy task. Hope you liked this article. We have detailed the calculation in our plastering work calculation post. Excel sheet for concrete. Plaster to be carried out in two layers of 10mm each. In this construction video tutorial, one can learn the detailed process through excel for estimating the quantity of labor necessary for plaster work. SU / alçı orani. 0.2 – 0.4 KG/m2. For rate analysis of plaster, 10 square meters is regarded as Unit Area. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. sqm 112.00 1118 15 mm thick cement plaster 1:4 with a floating coat of neat cement. 11.5 Cement and Cement Lime Plaster 11-4 11.6 Lime Plaster 11-14 11.7 15 mm Mud Plaster 11-17 11.8 Special Finishes 11-19 11.9 Pointing on Brick. Rate Analysis of Plaster. Material Estimation 2. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Tuketim Miktari > 3 N / … Besides, the table contains the lists of different types of labors like head mason, mason, male worker, female worker water carriers as well as contingencies. Lets us assume that we need workout rate analysis for 10 Square metre area of inner plastering work. For rate analysis of plaster, 10 square meters is regarded as Unit Area. Excel sheet for brickwork. Rate Analysis for Masonry and Cement Mortar Plaster. plaster: 32: 10 thick neeru plaster: 33: 15 thick neeru plaster: 34: 15 thick plain plaster with water proofing compound: 35: rate analysis for 20 mm thick plain plaster with water proofing compound in 2 coats: mortars: 36: rate analysis for cement mortar cm 1:2: 37: rate analysis for … For calculation purpose, assume a mix design of 1:1.5:3. Rate Analysis of Gypsum Plaster How to calculate the rate of Gypsum Plaster. The required manpower will differ based on the nature of the work such as plastering thickness, working height etc. ANALYSIS OF RATES • To determine the rate of a particular item of work from a quantities of materials and labours required and their costs • The rates of materials and labour are changing from place to place, therefore the rates o different items of work also changes from place to place Rate Analysis of Plaster. Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel Will Learn How to Create B.O.Q Of Project Mode Of Payments To Contractor So, to calculate the rate analysis of plaster we have to know the the quantity and rate of each materials. Rate Analysis of Plaster. Plaster equal to INR 300 for each day; Carpenter = INR 500 for each day; Bhishti = INR 350 for each day; Mazdoor = INR 350 for each day; Painter = INR 400 for each day; To download the excel sheet, click on the following link Rates of Building Construction For rate analysis of plaster, 10 square meters is regarded as Unit Area. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. lock. Why RATE-ANLY ? Have a Good Day . I have attached a sample rate analysis of various material used at construction project which includes following; Rate analysis of Concrete for various grades for RCC and PCC. 120 – 160 dakia. Adding Sundries & Contingencies percentage, Adding Overhead & Contractor profit percentage, Wages for the manpower including their transportation, Required Volume of Cement = 1/4 x 1.55 (void ratio ) x Mortar Volume  = 1/4 x 1.55 x (10*0.015) = 0.058 cum or 1.67 Bags, Required Sand Volume = 3/4 x 1.55 (void ratio) x Mortar Volume = 3/4 x 1.55 x (10*0.015) = 0.174 m. cost estimation for different construction activity, Determination of Specific Gravity of Cement, Determination of Standard Consistency of Cement, Deshuttering Time for Slabs, Beams and Columns, Difference between Nominal Mix and Design Mix. Author Bala. Calculate the rate analysis for plastering of a wall that has to plaster with 12 mm thick plaster … In unit of area is m2 or ft2. For rate analysis of plaster, 10 square meters is Page 9/23. 11-28 6. Plaster to be carried out in two layers of 10mm each. Final setting time. Excel sheet for plaster. Water consumption 5. The rates of these labors for 8 hours are also provided. 0.2 – 0.4 KG/m2. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. Rate Analysis for Waterproofing. 1117 15 mm thick cement plaster 1:3 with a floating coat of neat cement. Rate analysis of Plaster used of reference book IS Code 1200 part 12 (IS Code 1200 part 12 used for measurement), and CPWD Part 1. Before analysis, understand the general aspects of Rate analysis of civil works. Complete Material Statement In Excel; Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel; Will Learn How to Create B.O.Q Of Project; Microsoft Excel For Beginners; Auto-cad 2020 For Beginners Contingencies 7. In an earlier post, we had discussed the cost estimation for different construction activity. Calculate the rate analysis for plastering of a wall that has to plaster with 12 mm thick plaster … CONCRETE WORKS - EXCEL CALCULATOR Rate Analysis of Plaster. From our Labour output per day assumption. Item Unit Rate Remark 1114 (b). This method involves writing the formulas, in terms of CELL Nos (like A1, B1 ). Item No. This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity. From the mortar mix ratio (as per IS standard), the required mortar ratio is 1:3 and thickness is 15mm. Analysis & Rates. lock. The rate analysis of mortar need to be done for the calculated quantity required. Power consumption 4. Emulsion Paint (Internal use) (For viewing only) Definition: In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item.This process of determining the rates of an item is termed as analysis of rates or rate analysis. So, Let us take an example. Excel sheet for Flooring. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of … EXCEL CALCULATOR Rate Analysis of Plaster. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. In this construction video tutorial, one can learn the detailed process through excel for estimating the quantity of labor necessary for plaster work. He is … Preview - Quantity Survey & Rate Analysis. Rate analysis of Civil Works or Building Works is the determination of cost of each construction work per unit quantity. Cost of materials for plaster ingredients, cost of labor and the cost of carriage are included during analysis of concrete work. lock. Donma suresi.